Component to be inspected
Condensate drain lines and
p-trap
Heat exchanger fans
Chilled water header drain pan
and lines
Leak detection maintenance
WARNING:
caution when removing and replacing components that involve water around the electrical
equipment. There is great risk of electrical shock when water is used near electricity.
CAUTION:
water cooling system from the site. Contact HP immediately to initiate a field service call. Do not
attempt to repair the chilled water cooling system. Attempting to self-repair the chilled water
cooling system during the warranty or service contract period shifts all liability to you.
IMPORTANT:
information, see "Power down procedure" in the user guide.
Non-isolable leak detection
A non-isolable leak is a leak from the main supply line or the return header.
To repair a non-isolable leak:
Power down all IT equipment.
1.
Re-direct the leaking water away from the IT equipment.
2.
Repair the leak or contact HP if you are still within your service contract.
3.
Isolable leak detection
An isolable leak is any type of leak that does not occur from the main supply line or the return header.
To repair an isolable leak:
Inspect the zone indicated on the ECS Status Overview screen. You might need to inspect each zone
1.
condensate drain pan to determine the exact location of the leak.
Task
Inspect and verify:
No blockage of the drain
line—internal
Condensate can pass freely
P-traps are intact and not
leaking
No blockage of the drain
line—external to the site drain
Clean and remove debris as
necessary
Inspect wiring and verify that
electrical components are secure
and fan power supplies are locked
into position
Inspect drains for blockage
internal and external to the POD
Conduct five gallon operation
check of the external site drain, if
possible
To reduce the risk of electric shock or damage to the equipment, use extreme
If a serious leak develops, shut down the POD immediately and isolate the chilled
HP recommends shutting down the POD after a leak is detected. For more
Frequency
Capable Party
Quarterly
Qualified personnel
Quarterly
Qualified personnel
Qualified personnel
Monthly, if
staffed
Quarterly, if
not staffed
Annually
Qualified personnel
Periodic maintenance 63

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Performance Optimized Datacenter 40c North America and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Pod 40c na

Table of Contents