System Commissioning; Checking Before Power-On - Huawei SUN2000L Series User Manual

Hide thumbs Also See for SUN2000L Series:
Table of Contents

Advertisement

SUN2000L-(4.125KTL, 4.95KTL)-JP
User Manual

6.1 Checking Before Power-On

Table 6-1 Checklist before power-on
No.
1
2
3
4
5
6
7
8
9
Issue 03 (2018-04-11)
6
Check item
SUN2000L installation
WiFi antenna installation
Cable layout
Cable tie
Grounding
Switch
Cable connections
Unused terminals and ports
Installation environment
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

System Commissioning

Acceptance Requirement
The SUN2000L is installed correctly,
securely, and reliably.
The WiFi antenna is installed correctly,
securely, and reliably.
Cables are routed properly as required by the
customer.
Cable ties are secured evenly and no burr
exists.
The ground cable is connected correctly,
securely, and reliably.
The DC switch and all the switches
connecting to the SUN2000L are OFF.
The AC output power cable, DC input power
cable, and signal cable are connected
correctly, securely, and reliably.
Unused terminals and ports are locked by
watertight caps.
The installation space is proper, and the
installation environment is clean and tidy,
without foreign matter.
6 System Commissioning
50

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000l-4.125ktl-jpSun2000l-4.95ktl-jp

Table of Contents