7.1 System Power-On

● The product must be powered on within 24 hours after being unpacked. During
● If there is no AC input or no PV module is configured, press the black start
Procedure
Step 1 Set the DC SWITCH of the product to ON.
Step 2 Set the AC input switch to ON.
Step 3 After the initial installation and power-on, observe the LED indicator to check the
running status.
----End

7.2 System Commissioning

When the output voltage system is adjusted, the system is powered off and then
restarted. No manual operation is required.
Issue 01 (2021-09-30)
7
NO TICE
maintenance, the power-off time cannot exceed 24 hours.
button first.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
System Commissioning
7 System Commissioning