Maintenance " Servicing " Malfunction Removal; Organizational Measures; Personnel; Notes On Personnel - Festo MPS transfersystem Manual

Transfer line station
Table of Contents

Advertisement

General safety instructions
2.3

Personnel

© Festo Didactic GmbH & Co.KG. „ MPS-transfer system
2.2.5
Maintenance – Servicing – Malfunction removal
Carry out adjustments and inspections as instructed, in accordance with the
specified intervals.
Secure the compressed air and electricity supplies to prevent unintentional start-up.
During inspections, maintenance and repair work, the machine must be de-
energized, de-pressurized and secured against unexpected restart.
All screw connections released during maintenance, inspection or repair work must
be checked to ensure correct re-tightening.
2.2.6

Organizational measures

All existing safety devices must be checked at regular intervals.
2.3.1

Notes on personnel

Basically two situations have to be considered, concerning matters on personnel.
Activities during training operations
Activities outside training operations
2.3.2

Training operations

Trainees are permitted to work with the machine only under strict supervision of an
experienced person or an instructor.
Activities of trouble-shooting and fault correction are to be checked by the
instructor. Special care should be taken regarding safety aspects.
2.3.3

Outside training operations

Activities in the areas of maintenance, service and repair are to be carried out by
only persons with appropriate technical qualifications.
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents