Inspection Upon Receipt; Tracer Mp581 With Enclosure; Frame-Mounted Tracer Mp581; Required Tools - Trane Tracer MP581 Hardware Installation

Hide thumbs Also See for Tracer MP581:
Table of Contents

Advertisement

CNT-SVN01C-EN

Inspection upon receipt

Make sure that you have received the correct parts with your
Tracer MP581 controller. Visually inspect all parts for obvious defects or
damage. All components are thoroughly inspected before leaving the fac-
tory. Any claims for damage incurred in shipping should be filed with the
carrier.

Tracer MP581 with enclosure

The Tracer MP581 with enclosure ships with:
Enclosure with pre-mounted termination board
Main circuit board in a plastic frame
Enclosure door
Plastic bag containing four #10 (5 mm) wall anchors and four
#10 × 1.5 inch (5 × 40 mm) screws
Installation sheet

Frame-mounted Tracer MP581

The frame-mounted Tracer MP581 ships with:
Termination board in a plastic frame
Main circuit board in a plastic frame
Installation sheet
Note:
The four #8 (4 mm) screws required to mount the frame-
mounted Tracer MP581 are not supplied.

Required tools

To install the Tracer MP581 controller and check it for proper operation,
you will need the following tools:
Drill
Phillips-head screwdriver
Small flat-tip screwdriver (for terminal screws)
Digital multi-meter
Inspection upon receipt
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents