This gauge shows the pressure in the bottle
and indicates when the bottle is empty. Initial
bottle pressure will be 35-40 bar.
NOTE:
be careful not to lose the
small sealing olive in the
end of the braided hose.
This olive is necessary to
ensure a gas tight seal
between the braided hose
and the regulator.
After replacing a bottle or after making a gas connection, perform a Leak Test:
Stage1:
Turn the gas OFF
1.
Using soapy water applied with a sponge, or with a brush, cover all of the gas joints with a liberal
2.
amount of suds.
Stage 2:
Turn ON the gas
1.
Adjust the pressure to between 2.7- 3.0 bar
2.
Inspect the joint for leaks
3.
If any bubbles appear, the joint will need to
4.
be resealed.
Page 22 of 32
CO
Regulator
2
This gauge shows the adjustable limit (2.7- 3.0 bar)
required for the HydroTap to function correctly
Green zone
Relief
valve
Pressure regulating knob
5.5 - Leak Test
802700NZ - Commercial Installation Instructions - Aug 2015 - V2.01
ON - OFF knob