Familiarise yourself with the tap connections
RED
boiling
tube
(BC,
B only)
CLEAR
Vent
tube
(BC,
B only)
Refer to the HydroTap Command Centre installation
instructions.
Command Centre connections
USB
Boiling out
Chilled out
Vent
Ambient out
Cleaning and general maintenance
Wipe surfaces with a damp cloth and then wipe dry with a clean, dry cloth.
12
808081NZ v1.00 03.21 Industrial Tap Instructions
Connect to Command Centre
Boiling,
Boiling chilled,
Chilled
BLUE
Chilled
tube
(BC, C only)
Connected to the Tap.
Red silicone tube from tap. Cut to length.
(BC, C) Blue silicone tube from tap,
(BCS, CS) Blue JG pipe from tap.
Cut to length.
Clear silicone tube from tap. Cut to length.
Blue JG pipe from tap. Cut to length.
RED
boiling
tube
CLEAR
Vent
tube
USB
USB
Boiling
ambient
BLUE
JG
pipe