Installation Checklist - Zenith HydroTap G4 Celsius Series Installation Instructions Manual

Filtered, boiling, chilled and chilled sparkling drinking water with unfiltered hot and cold ambient water, for commercial kitchens
Table of Contents

Advertisement

Before Installation:
A.
Read the instructions and check if there is adequate space to mount all of the components.
B.
Note: Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
C.
Check the mains water pressure is between 172-700kPa for B & C models or 250-700kPa for
CS models or 200-700kPa when a Booster and/or external filter softner is installed.
D.
Check the water quality to determine if extra filtration will be required.
NOTE: This product must be fitted to a potable water supply
E.
Check the appliance rating plate and ensure correct power is available for the appliance.
F.
Check the under counter cupboard supporting the appliance is adequate for
the total weight of the appliance, when full of water.
Before Commissioning:
1.
Check the unit has been installed correctly.
2.
Check all plumbing fittings have been tightened.
3.
Ensure the outlet and vent pipes are positioned to drain correctly.
4.
Ensure there is adequate ventilation.
5.
Check all tubes from the undersink unit to the tap, have a constant rise and there are no
sags or kinks in the hoses.
6.
Check all electrical connections are correct and there are no loose wires.
Commission: (See section 7)
7.
Flush the supply line before connecting.
8.
Turn on the water and check for leaks.
9.
Flush the filters
10.
Purge the CO
2
11.
Where applicable, programme the unit to suit the customer's requirements.
Page 4 of 32

Installation checklist

802700NZ - Commercial Installation Instructions - Aug 2015 - V2.01

Advertisement

Table of Contents
loading

Table of Contents