Connecting Power; Led Sequence - Avaya G250 Quick Start For Hardware Installation

Hide thumbs Also See for G250:
Table of Contents

Advertisement

Connecting Power

To connect the power:
1. Connect the AC power cable to the inlet receptacle on the rear of the chassis.
2. Connect the other end of the power cable into a mains socket.

LED Sequence

When you turn on the G250, the following LED sequence occurs:
1. The PWR and ALM LEDs on the front panel light.
2. The CPU LED lights up after approximately 15 seconds if the firmware is running.
Connecting Power
Issue 5 November 2009
25

Advertisement

Table of Contents
loading

Table of Contents