Download Print this page

Circontrol Wallbox eNext T Installation Manual page 19

Hide thumbs Also See for Wallbox eNext T:

Advertisement

F
Verification
1 — P O W E R I N P U T
Before proceeding, make sure voltage is present in the terminal blocks.
For Three-Phase models pay special attention to Neutral Cable.
2 — C A R E F U L W I T H T H E W I R E S
Before closing the unit, keep in mind all cables should remain inside.
3 — C H E C K T H E P L U G S
Plugs should be in good conditions before starting the unit.
4 — E L E C T R I C A L P R O T E C T I O N S
If the unit includes electrical protections, rearm all of them.
5 — C H E C K T H E B E AC O N I N D I C AT O R S
All beacon indicators should light properly. Here's the reference:
P L U G S TAT E
B E AC O N C O LO R
A v a i l a b l e
G r e e n
C h a r g i n g
B l u e
F a u l t
R e d
6 — O P E R AT I O N
Check no abnormal noise appears while the unit is charging.
7 — P R E V E N T I V E M A I N T E N A N C E
It is recommended to perform one preventive maintenance per year.
17

Hide quick links:

Advertisement

loading
Need help?

Need help?

Do you have a question about the Wallbox eNext T and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Wallbox enext sWallbox enext series