VWR PCR Workstation Instruction Manual page 9

Table of Contents

Advertisement

Available languages

Available languages

Slot the back panel 2 onto the base 1. The
connecting link of the base 1 must fit in the
back panel 2. Take care not to squeeze
the sensor cable.
Connect both parts by screwing 3 screws 8 into the back side. Use the screw driver 9 to do this.
Turn the parts around 90° on the site of operation and incline both screwed parts to the back part of
the back panel 2. Screw both panels with 2 screws 8 from underneath. Tilt back the panels in
starting position with the back panel facing backwards.
Step 2
Remove the protective foil from the side
panels.
Insert the side panels 3 into the guiding
rails at the base 1 and push up against the
back panel 2 within the guiding rails at both
sides. Carefully screw the side panels 3
with 3 screws each in the base 1 and the
back
panel 2,
respectively.
supplied screws 8 and the screwdriver 9.
Step 3
Put the shelves 5 into the shelf brackets at
the back panel 2.
Remove the protective foil from the front
panel.
Put the front panel 4 onto the side panels
3.
Take care that the screw holes of the front
panel match the threaded holes in the side
panels 3. Hold the front panel 4 in place.
Screw the front panel 4 to both side panels
3 using 3 screws 8 each. Use the
screwdriver 9.
VWR Collection PCR Workstation
Use
the
Base 1
Front panel 4
8
Side panel 3
Side panel 3
Side panel 3
Shelves 5
Side panel 3
Back panel 2

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Pcr workstation hepa

Table of Contents