VWR PCR Workstation Instruction Manual page 10

Table of Contents

Advertisement

Available languages

Available languages

Step 4
Top assembly 6
Turn the assembled parts around 180°.
Remove the small UV tube at the back of the
top assembly.
Put the top assembly 6 onto the panels.
Take care not to squeeze the cables
Back panel 2
protruding from the back panel. Screw the
top assembly to the back panel 2 at two
positions. Use the screws 8 and screwdriver
9 supplied.
Connect the sensor cables from the back
panel 2 and the top assembly 6. Put the
power plug of the back panel 2 into the
power outlet of the top assembly 6.
Step 5
Insert the UV tube back in place.
Cover the service access of the top
Top assembly 6
assembly 6 with the ventilation cover 7.
Screw both parts together with 6 screws 8.
Use the screw-driver 9.
Ventilation cover 7
Turn the system around 180° and place it at
the site of operation as needed.
Finally connect the system to the power supply by plugging the power plug
from the back panel 2
into the local power outlet.
The system is now ready for operation now.
9
VWR Collection PCR Workstation

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Pcr workstation hepa

Table of Contents