LEFT BOX
1
Pre-drilled
wheel screw
holes
Left Box
Base
Pre-drilled
angle bracket
holes
Locking
Cam hole
Divider
screw
hole
2
Left Box: Side 2
BOTTOM
Build on a blanket for best results
Left Box
Lid
Unfinished edge
Post hole
16 Nuts
Green dowels
Post hole
TOP
Left Box
Side 2
Bottom View
Hammer (16) bolts into top of base.
Install (4) wheels onto bolts.
Tighten with (16) nuts using a
wrench or socket wrench.
Do NOT overtighten screws
Install small base support pins and posts into
BOTTOM of Side 2 as shown.
Install posts into TOP of Side 2 as shown.
With finished edges of Base & Lid facing down,
match up posts with post holes on Side 2.
Use mallet to tap Base and Lid into Side 2.
IMPORTANT
All panels must be installed at a right angle.
Damage may occur if not properly assembled.
(wheels should spin freely)
x4
Posts
x2
Small base support pins
3
16 Bolts
5
Need help?
Do you have a question about the WorkBox 3.0 and is the answer not in the manual?
Questions and answers