RIGHT BOX
1
Right Box
Pre-drilled
wheel screw
Base
holes
Pre-drilled
angle bracket
holes
Locking
Cam hole
Divider
screw
hole
2
BOTTOM
3
With finished edges of Base & Lid facing down,
match up posts with post holes on Side 2.
Use mallet to tap Base and Lid into Side 2.
Build on a blanket for best results
Right Box
Lid
Unfinished edge
Post hole
Green dowel
Post hole
Right Box: Side 2
TOP
16 Nuts
Hammer (16) bolts into top of base.
Install (4) wheels onto bolts.
Tighten with (16) nuts using a
wrench or socket wrench.
DO NOT overtighten screws
Install small base support pins and posts into
BOTTOM of Side 2 as shown.
Install posts into TOP of Side 2 as shown.
IMPORTANT
All panels must be installed at a right angle.
Damage may occur if not properly assembled.
Bottom View
x4
Posts
x2
Small base support pins
Right Box
Side 2
16 Bolts
(wheels should spin freely)
11
Need help?
Do you have a question about the WorkBox 3.0 and is the answer not in the manual?
Questions and answers