JLG G10-55A Operation & Safety Manual page 110

S/n 0160045636 & after including 0160045082, 0160045094, 0160045209, 0160045295, 0160045296, 0160045449
Table of Contents

Advertisement

Section 5 - Attachments
Operation:
• Raise or lower boom to appropriate height and open grapple for loading material
from stockpile.
• Align telehandler with face of stockpile and drive slowly and smoothly into pile to
load bucket.
• Tilt bucket up far enough to retain load, close grapple and back away from pile.
• Travel in accordance with requirements set forth in Section 1 - General Safety
Practices.
• Open grapple and tilt bucket down to dump load.
Equipment Damage Precautions
• Except for lifting or dumping a load, the boom must be fully retracted for all
bucket operations.
• Do not corner-load bucket. Distribute material evenly within the bucket. Bucket
capacity charts are for evenly distributed loads only.
• Do not use bucket as a lever to pry material. Excessive prying forces could
damage bucket or machine structure.
• Do not attempt to load material which is hard or frozen. This could cause severe
damage to quick switch or machine structure.
• Do not use bucket for "back dragging." This could cause severe damage to quick
switch and retraction cables/chains.
5-38
31200745

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G12-55a

Table of Contents