Transporting A Load; Leveling Procedure - JLG G10-55A Operation & Safety Manual

S/n 0160045636 & after including 0160045082, 0160045094, 0160045209, 0160045295, 0160045296, 0160045449
Table of Contents

Advertisement

Section 4 - Operation

Transporting a Load

After engaging the load and resting it against the backrest, tilt the load back to
position it for travel. Travel in accordance with the requirements set forth in Section
1 - General Safety Practices and Section 5 - Attachments.

Leveling Procedure

1. Position machine in best location to lift or place load.
2. Apply parking brake and move transmission control lever to NEUTRAL.
3. Observe level indicator to determine whether machine must be leveled prior to
lifting load. Level machine with frame level joystick (see page 3-11) or outrigger
joysticks (see page 3-13).
4. Move boom/attachment to 4 ft (1,2 m) off ground.
(AUS - Move boom so forks are no more than 11.8 in (300 mm) above ground
surface.)
Important things to remember:
• Never raise the boom/attachment more than 4 ft (1,2 m) above ground unless
telehandler is level.
(AUS - Never raise the forks more than 11.8 in (300 mm) above ground surface
unless telehandler is level.)
• The combination of frame leveling and load could cause the telehandler to tip
over.
4-6
OW0540
31200745

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G12-55a

Table of Contents