FULTON Vantage VTG Series Installation And Operation Manual page 57

Condensing hydronic boilers
Hide thumbs Also See for Vantage VTG Series:
Table of Contents

Advertisement

SECTION 4
VTG-IOM-2013-0815
1st
3rd
FIGURE 15A - VERIFYING TORQUE SETTINGS (FRONT VIEW, PANELS REMOVED)
VTG-2000 THROUGH VTG-5000
1st
Stage
Bridge
(4)
3rd
Stage
FIGURE 15B - VERIFYING TORQUE SETTINGS (FRONT VIEW, PANELS REMOVED)
2. Verify settings of the upper door. The upper door is retained by (4) 1-1/8"
nuts. Tools required for upper door setting verifi cation:
1-13/16" socket and ¾ x ½" adapter (U.S. only; these were
provided from the factory and should be stored in a safe place
in the boiler room). If these components have been misplaced,
Questions? Call (315) 298-5121, or visit us online at www.fulton.com
4th
Upper Door
2nd
Lower Door
Tighten nuts in
criss-cross pattern
4th
Stage
Upper Door
2nd
Stage
Lower Door
Tighten nuts in
criss-cross pattern
VTG-6000
MAINTENANCE
CAUTION
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
All maintenance procedures should
be completed by trained personnel.
Appropriate training and instructions
are available from the Fulton Service
Department at (315) 298-5121 or
your local Fulton Heating Solutions
Representative.
In order to meet warranty conditions,
ensure all appropriate maintenance
activities are performed.
4-5