FULTON Vantage VTG Series Installation And Operation Manual page 14

Condensing hydronic boilers
Hide thumbs Also See for Vantage VTG Series:
Table of Contents

Advertisement

INSTALLATION
SECTION 2
VTG-IOM-2013-0815
FIGURE 2 - SAFETY VALVE LOCATION
Note: Valve is shipped loose and must be installed by the contractor.
FIGURE 3 - SAMPLE PIPING LAYOUT
Note: Sample piping layout (P&ID) is a general representation of system installation. Good practice should be used in system design,
including but not limited to adequate pipe/valve sizing and natural fl ow path for system water.
2-8
© The Fulton Companies 2013