Wiring Schematics And Diagrams; Logic Chart - Toro Hydroject 3010 Service Manual

High-velocity water injection system
Hide thumbs Also See for Hydroject 3010:
Table of Contents

Advertisement

Wiring Schematics and Diagrams

Logic Chart

Each line on the Logic Chart shows the combination of
switch conditions that must be made for the listed action
to occur. Example - START, under ACTIONS: For the
engine to start the Key Switch must be moved to Start
(making terminals B + L + S) and the hydraulic pump
must be in Neutral (Traction Switch 1 CLOSED).
KEY
X
Switch Closed
O
Switch Open
Switch Closed Momentarily
Switch Conditon Not Relevent
ACTIONS
1. Start
2. Run
3. Machine Lower (aerate position)
4. Aerate
Machine Moving (out of neutral)
Machine Stationary (neutral)
5. Machine Raise (transport position)
Controller Timing
Aerate START-UP Sequence
1. Pump clutch engages immediately.
2. Valve clutch engages 5 seconds after pump clutch engages.
Aerate SHUT-DOWN Sequence (Neutral Delay)
1. Pump clutch disengages and green light goes off 4 seconds after transport switch opens (red light goes off).
2. After another 3 seconds, valve clutch will disengage.
NOTE: Keeping aerate start (engage) switch pushed in (closed) will keep green light on and override neutral delay
shut-down.
Aerate SHUT-DOWN Sequence (Disengage Delay)
1. Pump clutch disengages and green light goes off immediately when stop (disengage) switch is pushed in (opens)
or if pump start limit switch or water pressure switch opens (yellow light goes off).
2. After another 3 seconds, valve clutch will disengage.
Wiring Schematics and Diagrams
(see Controller Ti
ming below)
X
X
X
X
X
X
X
X
X
X
X
X
Page 5 - 2
O
X
X
X
X
X
X
X
X
O
Hydroject 3010
O
O

Advertisement

Table of Contents
loading

Table of Contents