Toro Hydroject 3010 Service Manual page 43

High-velocity water injection system
Hide thumbs Also See for Hydroject 3010:
Table of Contents

Advertisement

6. Next put IGR inner member on shaft spline with
semi-circular roll pockets between rotary valve ports.
7. Put contour member of IGR over inner and insert
seven rolls into inner pockets (large diameter rolls).
8. Lightly oil square ring seal (Item 4) and put in body
groove.
9. Put check balls (Item 6) over the two 1/8" inch
diameter holes in body. Be sure the check balls do not
fall into body tapped holes.
10. Put locating ring section (4.5 inch diameter) of IGR
(Item 5) onto body with check ball holes facing down­
ward over balls. Align the eight bolt holes in locating ring
with eight holes in body. The holes align in only one
position.
Hydroject 3010
NOTE: Be sure not to dislodge body square ring seal
while moving locating ring.
11. Install the eight locating ring rollers into their pockets
and oil lightly.
12. Put other lightly oiled square ring seal (Item 4) into
groove in cover and put cover over shaft end and align
bolt holes.
13. Install the eight bolts with lightly oiled thread ends
into bolt holes and tighten diagonally to 30 ft-lb.
NOTE: The shaft may not turn freely after assembly. A
short running period may be required.
Page 4 - 25
Repairs

Advertisement

Table of Contents
loading

Table of Contents