Download Print this page

Lutron Electronics Sivoia QED Manual page 4

Drapery track system

Advertisement

7. Insert the new bearing on the
new pulley shaft.
Next insert the new lower rail
box on the upper rail box.
8. Insert the (4) lower rail box screws and tighten until snug.
(Be careful not to over-tighten screws)
9. Re-install the track on the ceiling/wall.
Note:
For the following steps please refer to Sivoia QED installation and operating instructions
- Drapery System, P/N 045-121.
10. Mount the new EDU per the installation instructions.
11. Replace the existing 7-pin terminal block from the transformer/wall control/power panel, with the
new 7-pin terminal block, per the installation instructions.
12. Reapply power to the transformer and the EDU.
13. Set limits from EDU per the installation instructions.
Worldwide Technical and Sales Assistance
If you need assistance call the toll-free Lutron Technical
Support Center. Please provide exact model number
when calling.
24 hours/day + 7 days/week
(800) 523-9466 (U.S.A. and Canada)
Other countries call (610) 282-3800
Visit us on the web at www.lutron.com
Need additional assistance? Call the Lutron Technical Support Center 1-800-523-9466.
Track
Lutron Electronics Co., Inc.
7200 Suter Road
Coopersburg, PA 18036-1299 U.S.A.
Phone:
(610) 282-3800
Fax:
(610) 282-3090
Luton, Sivoia, and Sivoia QED are registered trademarks of Lutron Electronics Co., Inc.
© 2007 Lutron Electronics, Co., Inc.
P/N 045-129 Rev A
Screw
New lower
rail box
4

Advertisement

loading

This manual is also suitable for:

Enhanced sivoia qed