3.2 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system
2
Obtain all required equipment and tools
3
Site all equipment
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
22
3.3 System Limits
The following limits apply to the number of system components that
can be connected in an e7 / e7D / e95 /. e97 / e125 / e127 / c95 /
c97 / c125 / c127 system.
Component
Maximum number of SeaTalk
hs
devices
Maximum number of SeaTalk
ng
devices
e7 / e7D / e95 / e97 / e125 / e127 /
c95 / c97 / c125 / c127 multifunction
displays
e7 / e7D / e95 / e97 / e125 / e127 / c95 / c97 / c125 / c127
Maximum
25
50
6
Need help?
Do you have a question about the e7D and is the answer not in the manual?
Questions and answers