Adjusting the Stand Height

Note:
The stand height can be adjusted from 3.28 feet (1.00 meter) to 9.19 feet (2.80 meters).

Setting up the Measuring Base Station

1. Mount the measuring base station on the stand
1
Position the thread of the base station clip on the stand and screw the base station clip into place.
2
Fix the base station on the base station clip.
Note: To make the base station more secure, make sure the front side of the base station faces to the buckle.
3
Adjust the angle of the base station to an appropriate position.
2
1
Deployment Toolkit
3
2

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DECT IP Multi-Cell Deployment ToolKit and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents