Powerware PowerPass 9125 User Manual page 34

Distribution module pdm, for use with two-in-one 5000/6000 va
Hide thumbs Also See for PowerPass 9125:
Table of Contents

Advertisement

Installation
13.
14.
15.
16.
17.
18.
Failure to match the UPS voltage may result in a hazardous condition, including
damage to the UPS or to the load.
19.
NOTE
power to the output on the PDM rear panel, but does NOT shut off power
to the UPS (opening the upstream protection would be required).
20.
NOTE
However, it is recommended that the batteries charge for 24 hours after
installation or long-term storage.
28
Powerware
9125 Two-in-One (5000/6000 VA) PDM User's Guide
®
Remove the breaker tie from all battery circuit breakers.
Switch all battery circuit breakers to the ON ( | ) position.
If an emergency power-off (disconnect) switch is required by
local codes, see "Remote Emergency Power-Off" on page 21 to
install the REPO switch before powering on the UPS.
Switch the main utility breaker on.
µ
The
indicator flashes, indicating the UPS is in Standby mode
with the equipment offline.
Press the On button on the UPS front panel.
µ
The
indicator stops flashing and the bar graph indicators
display the percentage of load being applied to the UPS.
Confirm the UPS output voltage through the front panel and
verify that it matches the PDM output voltage (see page 31).
C A U T I O N
Switch the PDM output circuit breaker to the ON ( | ) position.
The PDM output circuit breaker (disconnect switch) disconnects
Install the PDM front panel.
The batteries charge to 80% capacity in less than 2 hours.
Rev B www.powerware.com