3.
4.
Powerware
9125 Two-in-One (5000/6000 VA) PDM User's Guide
®
If installing additional cabinets, repeat Step 2 for each cabinet.
Joining Bracket
Figure 5. Installing the Joining Brackets (Top View)
If you are installing an optional EBM, continue to the following
section, "EBM Installation;" otherwise, continue to
"Plug-Receptacle PDM Installation" on page 17 or "Hardwired
PDM Installation" on page 23.
S
UPS
PDM
Joining Bracket
Rev B www.powerware.com
Installation
15