Hardwired Pdm Installation - Powerware PowerPass 9125 User Manual

Distribution module pdm, for use with two-in-one 5000/6000 va
Hide thumbs Also See for PowerPass 9125:
Table of Contents

Advertisement

Hardwired PDM Installation

Only qualified service personnel (such as a licensed electrician) shall perform
the electrical installation. Risk of electrical shock.
For PDM models with hardwired outputs, overcurrent protection for the
output AC circuit(s) is to be provided by others.
For PDM models with hardwired outputs, suitably rated disconnect switches
for the output AC circuit(s) are to be provided by others.
NOTE
damage may occur to your equipment and void your warranty.
The Powerware 9125 requires a dedicated branch circuit that meets the
following requirements:
40A minimum circuit with short circuit and overcurrent protection
200–240 Vac
Single-phase
50/60 Hz
The breaker must be wall-mounted within 6 ft (1.8m) of the UPS and
be readily accessible to the operator
Flexible metal conduit is recommended for ease of service and
maintenance
To hardwire the PDM:
1.
2.
3.
Powerware
9125 Two-in-One (5000/6000 VA) PDM User's Guide
®
W A R N I N G
C A U T I O N
Do not make unauthorized changes to the UPS; otherwise,
If you are installing power management software, connect your
computer to the USB port or UPS communication port. For the
communication port, use only the serial cable supplied in the
accessory kit.
Switch off utility power at the distribution point where the UPS
will be connected. Be absolutely sure there is no power.
Verify that the PDM output circuit breaker is in the OFF position
(see Figure 11).
S
Rev B www.powerware.com
Installation
23

Advertisement

Table of Contents
loading

Table of Contents