Installation And Operation; Unpacking And Inspection; Wiring Terminal View - Njoy Ranger Series User Manual

3 phase in/ 3 phase out up
Hide thumbs Also See for Ranger Series:
Table of Contents

Advertisement

2

Installation and operation

2.1. Unpacking and inspection

Unpack the package and check the package contents. The shipping package
should contain:
• One UPS
• For Ranger 60 KT (UP33TOP160KGAAZ01B) you should have the
following cables:
Length
No.
Description
(cm)
1
UPS to Cabinet 3x AWG 2
150
NOTE!
Before the installation, please inspect the unit. Be sure that there is no physical
damage to the unit. Do not turn on the unit and notify the carrier and dealer
immediately if there is any damage or missing parts and accessories. Please keep
the original packaging for future use. It is recommended to keep each equipment
and battery set in their original packaging because they have been designed to
provide maximum protection during transportation and storage.
8
Quantity
Observations
(pcs)
Ring 10.4mm to
1
Ring 10.4mm

2.2. Wiring terminal view

1
RS-232 communication port
2
USB communication port
3
Emergency power off function connector (EPO connector)
4
Share current port
5
Parallel port
6
Intelligent slot
7
External battery connector/terminal
8
Line input circuit breaker/switch
9
Maintenance bypass switch
10
Input/Output terminal (Refer to diagram 2 and 3 for details)
11
Line input terminal
12
Output terminal
13
Input grounding terminal
14
Output grounding terminal
15
Bypass input circuit breaker/switch
16
Bypass input terminal
17
Output switch
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ranger 60ktUp33top160kraaz01b

Table of Contents