Operation - MULTIQUIP LD6 Operation Manual

Ride-on power trowel (b&s vanguard 23 hp gasoline engine)
Hide thumbs Also See for LD6:
Table of Contents

Advertisement

6. Try adjusting the pitch of the blades using the left and
right blade pitch control switches (Figure 27). This can
be done with the trowel stopped or while the trowel is
moving.
L
LEFT
PITCH
Figure 27. Blade Pitch Control Switches
7. Test the operation of optional equipment such as
retardant spray and lights.
8. Pull both the left and right joysticks backward
(Figure 28) and repeat steps 3–4 while substituting
the word reverse for forward.
Figure 28. Joysticks (Reverse)
PAGE 32 — LD6 RIDE-ON POWER TROWEL • OPERATION MANUAL — REV. #0 (02/10/20)
R
P/N 45658
RIGHT
PITCH
ENGINE SHUTDOWN
1. Reduce engine speed and allow the engine to idle for
3–5 minutes.
NOTICE
Failure to allow the engine to idle for a few minutes
before shutdown may lead to engine damage.
2. Turn the ignition key counterclockwise to the OFF
position, then remove the key.
3. Clean and remove any debris from the trowel.

OPERATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Whiteman series

Table of Contents