Connecting
6.5 Grounding
Connecting up functional ground
Screw-in grounding bolts
3
4
③
Grounding terminal with cable
④
Washer
⑤
Spring washer
⑥
Nut
Follow the steps below to connect the functional ground:
1. Put the parts
2. Tighten the nut
6.5.1.2
Grounding of the X-300EEC
Position
On the SCALANCE X-300EEC, the grounding bolt is on the bottom of the device.
Figure 6-1
126
5
6
③
④
⑤
,
and
⑥
with a maximum tightening torque of 1.5 Nm.
Grounding bolts on the bottom of the X-300EEC housing
Pressed in grounding bolts
together on the grounding bolt as shown in the drawing.
Operating Instructions, 11/2019, A5E01113043-24
3
4
5
6
SCALANCE X-300