Siemens SCALANCE X-300 Series Operating Instructions Manual page 127

Industrial ethernet switches
Hide thumbs Also See for SCALANCE X-300 Series:
Table of Contents

Advertisement

Connecting ground
Follow the steps below to connect ground:
1. Put the parts
2. Tighten the nut
SCALANCE X-300
Operating Instructions, 11/2019, A5E01113043-24
1
2
Grounding terminal with cable
Washer
Spring washer
Nut
,
and
with a maximum tightening torque of 1.5 Nm.
3
4
together on the grounding bolt as shown in the drawing.
Connecting
6.5 Grounding
127

Advertisement

Table of Contents
loading

Table of Contents