Figure 2-29: Location Of 2216 On Mount; Figure 2-30: Location Of 2216 On Optic - NORTHROP GRUMMAN Iklwa II TEM00 Service Manual

Green laser
Table of Contents

Advertisement

7. Inspect the new optic using a microscope for cleanliness and damage. Clean
8. Apply 2216 epoxy to the mount as shown in Figure 2-29.
9. Place optic into mount and bond at the locations as shown in Figure 2-31
10. Cure at 66°C for 2 hours, or for a minimum of 12 hours at room temperature.
11. Remove #8-32 screw and shims. See Figure 2-30 for how it should look.
12. Orient steering mirrors according to Figure 2-31.
© 2019 Cutting Edge Optronics
as required.

Figure 2-29: Location of 2216 on Mount

below. Use #8-32 screw and .002 shims (red) to secure and center optic. Be
sure that the assembly remains flat until the 2216 is cured.

Figure 2-30: Location of 2216 on Optic

Chapter 3: Tuning and Testing Procedures
36
Patara II and Iklwa II Service Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Patara ii tem00

Table of Contents