Optics Bonding - NORTHROP GRUMMAN Iklwa II TEM00 Service Manual

Green laser
Table of Contents

Advertisement

Optics Bonding

© 2019 Cutting Edge Optronics
Screw elbows into new module until vertical, leaving a few degrees of
rotation in either direction.
6. Remove the electrical shorting strap from the new pump module. Place the
new module on the locator pins on the bench and tighten down with the three
(3) 8-32 x 5/8" screws.
7. Replace the plumbing jumpers in the locations denoted in step 3 and tighten
(do not over-tighten).
8. Tighten the sealing nuts on the diode module.
9. Place new heat shrink insulation on the electrical wire leads and connect each
lead to the laser module. Ensure the polarity is correct with red to positive (+).
Do not over-torque.
10. Inspect the work to ensure proper installation.
1. Using a dental pick, place three drops of 2216 epoxy on the ledge of the inner
diameter of the mirror mount. The diameter of the drops should be 1/16" to
1/8". The three drops should be in a triangular pattern, the first drop at the top
with 120 degrees between the remaining drops.
Figure 2-13: Mirror/Lens Assembly – Initial Epoxy Locations
2. Place the lens/mirror into the mount. Refer to the engineering drawing for the
specific subassembly to ensure the correct orientation of the lens/mirror in the
mount.
Chapter 3: Tuning and Testing Procedures
24
Patara II and Iklwa II Service Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Patara ii tem00

Table of Contents