Avaya Virtual Services Platform 7000 Series Installation Manual page 28

Hide thumbs Also See for Virtual Services Platform 7000 Series:
Table of Contents

Advertisement

Switch installation
Rack requirements
• Space of 2.8 inches (7.1 cm) for each switch in an E1A or 1EC standard 19 inch (48.2
cm) equipment rack and T1A 23 inch (58.5 cm) equipment rack.
• Appropriate rack space to accommodate 1U switch height (44 mm).
• Four post rack bolted to floor and braced if necessary
• Four post rack must be grounded to the same grounding electrode used by the power
service in the area. The ground path must be permanent and must not exceed 1 Ohm of
resistance from the rack to the grounding electrode.
Verify that you have all the screws, brackets, and clamps to assemble and install the four post
rack mount kit.
Figure 10: Four post rack mount kit assembly
About this task
Perform the following procedure to assemble and install the four post rack mount bracket kit.
Procedure
1. Attach a front bracket to each guide bracket with four M2 x 3mm long flat head
28
VSP 7000 installation
machine screws.
Comments? infodev@avaya.com
April 2012

Advertisement

Table of Contents
loading

Table of Contents