Machine installation
4.3
Cleaning
The machine must be cleaned with a soft cloth before commissioning. All bare metal parts
must be freed from rustproofer using a clean cloth.
4.4
Positioning the machine
The machine can be pushed into place and secured there using the adjusting feet.
4.5
Electrical connection
Check that the electrical supply meets requirements. Details about the distribution voltage,
frequency, fuse protection and connection specific to the country in question can be taken
from the wiring diagram. The wiring diagram is in the documentation folder.
4.6
Checks before first commissioning
4.6.1
Control box
During transport, it is possible that the screws on the electrical terminals are loosened. In
order to ensure trouble-free operation, it is necessary to tighten up the terminals of the relays
and contactors.
4.6.2
Safety hoods function
Before the machine is integrated into the production process, the function of every safety
hood switch must be checked, in order to ensure that the machine functions perfectly.
View
1
Picture 1725
(1)
Circuit breaker
hood press
(2)
Circuit breaker
hood shaft
(3)
Circuit breaker door
Subject to change without notice
2
Picture 1724
Signals the controls that the hood is open.
Signals the controls that the hood is open
Signals the controls that the door is open
3
4
15