Preparation
4.2
Rack model
Ê Exit all applications and shut down the server properly.
Ê Press the On/Off button if the server has not been switched off by the
operating system.
Ê Pull all power connectors out of the power outlets.
4.2.1
Opening the server
Figure 7: Loosening the knurled screws
Ê Loosen the four knurled screws (1) and pull the server as far as possible out
of the rack (2).
TX150 S6
2
Options Guide
Rack model
1
25