1 — Introduction
Activity
Assembling
Rack-mounting
Grounding
Securing slide assembly
cables
Installing modules
Connecting primary rate
link
Connecting data circuit
Connecting node
management equipment
Connecting external alarm
equipment
Note
(1)
If you are using the Craft Interface Node Manager or a 5620 Network Manager for the node
management, consult the Craft Interface Node Manager or 5620 NM documentation for installation
requirements.
1-12
Table 1-4 Installation tools and hardware
Tools and hardware
•
Antistatic wrist strap
•
Small slot screwdriver
•
#1 and #2 Phillips screwdrivers
•
#2 Phillips screwdriver
•
One rack-mount kit (19-inch) available from your supplier (part
number 90-2901-01)
•
One rack-mount slide assembly (19-inch or 23-inch) available from
your supplier (part numbers 90-2367-01 and 90-2367-02
respectively)
•
Wire stripper
•
Crimp tool
•
One ring lug
•
Three spade lugs
•
Slot screwdriver
•
5/16-inch nut driver
•
10, 12 or 16 AWG cable (2.6, 2.0 or 1.5 mm nominal diameter)
•
Wire cutter
•
Cable ties
•
#1 and #2 Phillips screwdrivers
•
#2 nut driver
•
Module extraction tool
•
EPROM IC insertion tool
•
EPROM IC extraction tool
•
Adapters (as required)
•
Cabling (as required)
•
Personality modules
•
Adapters and cabling (as required)
•
Adapters (as required)
•
Cabling (as required)
•
Node management terminal (VT100-compatible terminal or VT100
(1)
terminal emulator)
•
RJ11-to-spade lug cable
•
RJ11-to-RJ11 cable
•
Distribution box
2902 MainStreet Technical Practices
90-2906-01
May 2002