Installation And Operation; Positioning And Connection - Bartscher 900T2 Series Manual

Table of Contents

Advertisement

5. Installation and operation

5.1 Positioning and connection

CAUTION!
The installation and connection of the device should be made only by
qualified specialist establishment.
Positioning
Unpack the device and remove any packing material.
Place the device on a firm, dry, level and waterproof surface adapted to the impact of
high temperatures and sufficient load-bearing capacity for the weight of the device
including the entire contents.
Never place the device on flammable surfaces.
Do not place the device in the vicinity of an open flame, electric ovens, heating
stoves or other heat sources, such as direct sunlight. High temperatures may
adversely affect cooling performance and power consumption.
The device should be set so that there is an adequate supply of air circulation. Keep
a 10 cm clearance on the sides and rear, and 30 cm from the ceiling or cabinets.
Never cover and do not block ventilation openings.
Do not place the device in places where there is high humidity. Too much moisture
can cause damage to the device. The optimum operating conditions at the set device
is achieved at ambient temperatures between 10 °C and 30 °C and relative humidity
between 30-55%.
In order to avoid damage to the legs or other equipment, in the case of moving,
lift the device (eg. by forklift).
Place the device so that the plug is easily accessible in order to quickly
disconnect the device from the power supply if need arises.
After placing the device in the intended place, level it by tightening or loosing the feet.
Remove the protection foil from the device before the first use.
CAUTION!
 Never remove the rating plate and any warning signs from the device.
- 37 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

900t1s226640110157200259200278110156

Table of Contents