Initial Commissioning; Checking The Activation Of The Battery Modules; Switching On; Figure 24: On/Off Button - Varta element Series Instruction Manual

Hide thumbs Also See for element Series:
Table of Contents

Advertisement

8.10

Initial commissioning

8.10.1

Checking the activation of the battery modules

If you do not perform initial commissioning directly after
the installation of the battery modules, the battery
modules have to be activated again. See Chapter 8.9.4
Installing and connecting battery modules.
8.10.2

Switching on

The VARTA element energy storage system is switched on as
follows:
Make sure that the network cable is connected.
Connect the fuse at the building grid.
Activate storage system using On/Off button. The button
will be locked in the lower position.

Figure 24: On/Off button

Subject to modification!
94
This section is intended for the
qualified electrician.
Updated 10/2017

Advertisement

Table of Contents
loading

Related Products for Varta element Series

This manual is also suitable for:

Element 6Element 9Element 12Element 3

Table of Contents