Operating Mode I: Pe-Pipe Pull-Off; Machine Transport To Set-Up Position - Bauer Rainstar TX Plus Series Operating Manual

Table of Contents

Advertisement

5.2 OPERATING MODE I: PE-PIPE PULL-OFF

5.2.1 Machine transport to set-up position

When you position the RAINSTAR make sure that the machine's vertical axis of rotation is in the middle
of the driving lane or centred between two crop rows.
Operating manual for BAUER RAINSTAR
During transport the reel should be turned into the driving
direction and secured with the lock bolt. Cart, jack, and both
rear
support
For lateral PE-pipe pull-off, set up the RAINSTAR on the
headland at right angles to the selected irrigation strip and
detach it from the tractor.
Adjust the undercarriage about level with the jack.
For lateral pull-off remove the lock bolt, turn the reel into the
direction of the driving lane and secure it again with the lock
bolt.
Remove transport lock bolts from support legs.
Series TX Plus
legs
must
be
lifted
or
withdrawn.
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rainstar tx plus e

Table of Contents