8.2.2 MAINTENANCE INSTRUCTIONS

DANGER
Incorrect maintenance/repair!
Danger to life and equipment damage.
Only a WAGNER service center or a suitably trained person may carry out repairs and
replace parts.
Only repair and replace parts that are listed in the "Spare parts" chapter and that are
assigned to the unit.
Before all work on the device and in the event of work interruptions:
– Switch off the energy and compressed air supply.
– Relieve spray gun and device pressure.
– Secure the spray gun against actuation.
Observe the operating and service manual for all work.
Prior to maintenance
– Flush and clean the system.
After maintenance
– Carry out safety checks in accordance with Chapter 8.2.3.
– Put the system into operation and check for leaks.
– Have the system checked for safe condition by a skilled person.

8.2.3 SAFETY CHECKS AND MAINTENANCE INTERVALS

Daily: Before starting work, carry out a visual inspection to ensure that the system is grounded.

8.2.4 MAINTENANCE PROCEDURES

The maintenance intervals should be adapted by the operator depending on the level of
use and if necessary the level of soiling.
If in doubt, we recommend contacting WAGNER's specialist personnel.
Maintenance work
Blow out gun and check for sintering
Check gun settings
Check gun discharge pressure
Blow out powder hoses
Check grounding
Check compressed air quality
Check gun voltage
Check powder hoses for bends and sintering
ORDER NUMBER DOC2326960
Chapter
8.1.2
once each shift
PEM-X1 CG
Time stamp
weekly
37