Circuit Description
J4 PIN
2.2.6
Jumper Selections
The EVM features several jumpers whose functions are described in
surface-mount jumpers in cases where either the signal integrity is important or the functions are rarely
used.
Table 3
summarizes these options.
8
Table 1. Breakout Board Pin Assignments
ADS6122/23/B23/24/25
DESCRIPTION
1
GND
2
CLK
3
GND
4
NC
5
GND
6
NC
7
GND
8
NC
9
GND
10
Data bit 0 (LSB)
11
GND
12
Data bit 1
13
GND
14
Data bit 2
15
GND
16
Data bit 3
17
GND
18
Data bit 4
19
GND
20
Data bit 5
21
GND
22
Data bit 6
23
GND
24
Data bit 7
25
GND
26
Data bit 8
27
GND
28
Data bit 9
29
GND
30
Data bit 10
31
GND
32
Data bit 11 (MSB)
33
GND
34
NC
35
GND
36
NC
37
GND
38
NC
39
GND
40
NC
ADS6142/43/44/45 DESCRIPTION
GND
CLK
GND
NC
GND
Data bit 0 (LSB)
GND
Data bit 1
GND
Data bit 2
GND
Data bit 3
GND
Data bit 4
GND
Data bit 5
GND
Data bit 6
GND
Data bit 7
GND
Data bit 8
GND
Data bit 9
GND
Data bit 10
GND
Data bit 11
GND
Data bit 12
GND
Data bit 13 (MSB)
GND
NC
GND
NC
GND
NC
GND
NC
Table
2. The EVM also features
SLAU206B – September 2007 – Revised April 2008
Submit Documentation Feedback
www.ti.com
Need help?
Do you have a question about the ADS61B23EVM and is the answer not in the manual?