TI ADC SPI Control Interface
3
TI ADC SPI Control Interface
This section describes the software features accompanying the EVM kit. The TI ADC SPI control software
provides full control of the SPI interface, allowing users to write to any of the ADC registers found in the
ADC data sheet. For most ADS61xx/ADS61B23 performance evaluations, users do not need to use the TI
SPI control software to get evaluation results. Users only need to use the ADC SPI control software when
the desired feature is inaccessible because the ADC is in parallel interface mode.
3.1
Installing the ADC SPI Control Software
The ADC SPI control software can be installed on a personal computer by running the setup.exe file
located on the CD. This file installs the graphical user interface (GUI) along with the USB drivers needed
to communicate to the USB port that resides on the EVM. After the software is installed and the USB
cable has been plugged in for the first time, the user is prompted to complete the installation of the USB
drivers. When prompted, users should allow the Windows
and it should automatically find the TI ADC SPI interface drivers. See
Note:
Before plugging in the USB cable for the first time, install the TI ADC SPI software. The
software installs the drivers necessary for USB communication.
10
Figure 1. TI ADC SPC Interface Screen
operating system to search for device drivers,
®
Figure
1.
SLAU206B – September 2007 – Revised April 2008
Submit Documentation Feedback
www.ti.com
Need help?
Do you have a question about the ADS61B23EVM and is the answer not in the manual?