1

Overview

This user's guide gives a general overview of the evaluation module (EVM) and provides a general
description of the features and functions to be considered while using this module. This manual is
applicable to the ADS6122, ADS6123, ADS6124, ADS6125, ADS6142, ADS6143, ADS6144, ADS6145,
and ADS61B23, which collectively are referred to as ADS61xx and ADS61B23. The ADS61xx/ADS61B23
EVM provides a platform for evaluating the low-power, single-channel ADS61xx/ADS61B23 12- and 14-bit
analog-to-digital converters (ADC), and the ADS61B23 12-bit ADC with buffered analog input under
various signal, reference, and supply conditions.
This document should be used in combination with the respective ADC data sheet.
1.1

ADS61xx/ADS61B23 EVM Quick-Start Procedure

Using the quick-start procedure, many users can begin evaluating the ADC in a short time. The quick-start
procedure uses the default conditions of the EVM as shipped from the factory. In addition, the quick-start
guide configures the ADC in a CMOS offset binary data format. Users who have modified the board may
find the quick-start procedure to be ineffective.
1. Supply 3.3 V to J11 while connecting the return to a shorted J11 and J14. Power on the device.
2. Confirm jumper J6 is shorted 1–2 and jumpers J2, J3, and J7 have positions 2–3 shorted.
3. Use the silkscreen to confirm jumper J1 is set to Offset Binary, CMOS output.
4. Use the silkscreen to confirm jumper J4 is set to 0dB Gain, Int Ref.
5. Supply a –1-dBFS filtered, low-phase-noise, 10-MHz CW tone into J8.
6. Supply a filtered, low-phase-noise clock to J9.
7. Use the accompanying breakout board and monitor the digital output (see
Windows is a registered trademark of Microsoft Corporation.
Samtec is a trademark of Samtec, Inc.
Xilinx, Virtex are trademarks of Xilinx, Inc.
All other trademarks are the property of their respective owners.
SLAU206B – September 2007 – Revised April 2008
Submit Documentation Feedback
SLAU206B – September 2007 – Revised April 2008
Table
1).
User's Guide
5

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS61B23EVM and is the answer not in the manual?

Table of Contents