Download Print this page

Advertisement

Quick Links

Installation Instructions

Ground Fixed
Duo
Page 1 of 4
Instrument
Components:
x8
M8 Nyloc Nut
x4
M6x20 Security Screw
x8
2 Part Cover Cap
x2
M6 Saddle Strap
Metric Conversion:
250mm/ 10"
400mm/ 15 3/4"
550mm/ 21 21/32"
700mm/ 27 9/16"
850mm/ 33 15/32"
1.5m/ 59"
Weight of heaviest part
BS EN 1176
(1.1)
(1.3)
14kg
(Duo)
Ground Fix
Pair Small Red
Beaters X2
Components:
1. Attach the steel legs to the
base of the instrument with
the M8 Nyloc Nuts and 2 part
security caps. (1.1) (See
Assembly Guide)
2. Attach Ground Fixing posts
to legs(1.2) (See Ground Fix
Post Installation Sheet)
3.Excavate 2 holes for the
Steel legs 250mm diameter
by 400-550mm deep
depending on Key stage, in
desired location upon
(1.2)
decision from customer.
4. Locate (lower) legs into
holes making sure they are
vertical and level prior to
concreting in place.
5. Once happy with location
of the Instrument, fill holes
using rapid hardening
concrete. Be sure to compact
concrete around legs and
leave to dry according to
manufactures guidelines.
6. Attach the 1 pair of beater
to the saddle strap on the leg.
(1.3)
x4
x8
M10x200 Bolt
M10 Nut
1.5m
1.5m
KS1 – 700mm
KS2 – 850mm
KS1,2
Ground Surface
KS2 - 400mm
KS1 - 550mm
Spares available from
percussionplay.com
or from your
local distributor
Install Instrument
with 1.5m free space
(from widest point)
around it.
28 Kg

Advertisement

loading
Need help?

Need help?

Do you have a question about the Duo and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Percussion Play Duo

  • Page 1: Installation Instructions

    850mm/ 33 15/32” 6. Attach the 1 pair of beater KS2 - 400mm 1.5m/ 59” to the saddle strap on the leg. Weight of heaviest part 14kg (Duo) KS1 - 550mm (1.3) Spares available from Ground Fix Pair Small Red 28 Kg percussionplay.com...
  • Page 2 Assembly Guide PPDUO Tools: TX 30 Driver Bit TX 40 Driver Bit Ground Fixed Page 2 of 4 COMPONENTS LIST: 2 Part Cover Cap X8 Thread Lock Solution M8 Nyloc nut X8 Required (Not Supplied) M10 Nut X8 Instrument (1.1) Components: M10x200 Threaded Bar X4 Saddle Strap X2...
  • Page 3 Part 7 of BS EN 1176. Ground Fixed Page 3 of 4 (1.1) Components: DUO HD Hole Centres Black HDPE and Aluminium Body M10x200 Bolt M10 Nut Metric Conversion: 193mm/ 7 19/32”...
  • Page 4 350mm diameter Lower ground Fix post specifications. and 450mm depth attached to instrument into hole (check Aggregate instrument straight and 400mm min depth level before filling with concrete) Duplicate points 1-5. Duo requires 2 Ground Fix Posts BS EN 1176...