Installation Instructions
Surface Fixed
Akadinda
Page 1 of 2
(1.1)
Instrument
Components:
M10 Wedge
M10 x30 SS
NutX2
Washer X2
M8x25 SS
Eye Straps
Washer X8
X2
Pin Torx 25
M8 Lock
Driver Bit X1
Nut X4
10x38mm
M10x130
Secure Screw
Bolt X2
X4
Black Caps
5x70mm
X8
Screw X4
BS EN 1176
(1.2)
Weight of heaviest part
28kg
(Frame)
Surface Fix
Pair Large Red
Components:
Beaters X2
1. Assemble Akadinda frame
comprising 2x 'X'-shaped legs
and 1x horizontal beam. (See
Assembly Guide).Cover 8
holes on horizontal beam
using 4xBlack caps (1.1)
2.Locate M8x80mm eye bolts
through pre drilled holes
using flat washers on both
sides of the timber to prevent
the fixing pulling into the
timber. Secure in place with
M8 nyloc nuts, cover 4 holes
in ends using 4xBlack caps.
(1.2)(1.3)
3. Attach L Brackets to legs of
frame with coach bolts
provided. Pilot holes required
to stop timber from splitting
(1.3)
4. Place Akadinda in desired
location and mark 4 holes for
surface fixing.
5. Fix to Surface using
recommended ground
anchors not supplied
6. Make sure all fixings are
covered and secure using
cover caps provided
x8
x4
2 Part Cover Cap
L Brackets
M8x50 Coach Screw
1.5m
1.5m
Height to centre of notes:
KS0 3-5 500mm Depth 400mm
KS1 5-7 650mm Depth 250mm
KS2 7-11 750mm Depth 150mm
Adult 900mm Surface Mounted
Mount eye straps in the
centre of the beam 360mm
from each end to attach the
beaters.
Ground Surface
Spares available from
Ground Anchors
x4
percussionplay.com
not supplied
local distributor
Install Instrument
with 1.5m free space
(from widest point)
around it.
1.5m
1.5m
Metric Conversion:
150mm/ 6"
250mm/ 10"
360mm/ 14"
400mm/ 16"
500mm/ 20"
650mm/ 26"
750mm/ 30"
900mm/ 35"
1.5m/ 59"
48 Kg