Set-up and assembly

3.5.1 Installation plan

3.5.2 Requirements regarding the installation site

Keep a work area of at least one metre around the machine free for operation and mainte-
nance.
In order to achieve sufficient safety against falls by slipping, the accessible area in the mechani-
cal machining zone of the machine must be equipped with a slip resistance. The slip-resistant
mat and/or slip-resistant flooring must be at least R11 in accordance with BGR 181. The deter-
mination of this requirement resulted in the risk assessment of the machine.
The used shoes must be suitable for being used in those machining areas. The accessible sur-
faces must be cleaned.
Organise the working area around the milling machine machine according to the local safety
regulations.
INFORMATION
In order to achieve high levels of functionality and machining accuracy, as well as a long
service life of the machine, the set-up location should meet certain criteria.
The following points should be noted:
The device must only be installed and operated in a dry and well-ventilated place.
Avoid places close to machines which cause chips or dust.
Assembly and commissioning
Version 1.0 dated 2017-05-24
Translation of the original instructions