Webasto Live Configuration Instructions page 21

Table of Contents

Advertisement

Available languages

Available languages

External Meter Sample Rate – Interval in which the readings from the external meter of the master charging station are
made available (no selection currently possible)
This parameter is used to configure the time interval in which the external meter of the master charging station provides readings. If
necessary, adjust the interval to the specifications of your back end provider.
NOTE
Refer to the specifications of the external measuring
device.
Current Imbalance Prevention – Taking into account the phase imbalance for the load management
The load management of the Webasto Live can incorporate a limitation of the maximum phase imbalance at the connection point. Set
the parameter to "On" to activate the function.
Default Value: Off
Current Imbalance Limit – Maximum phase imbalance for the load management
Here you can configure the maximum current value for the load management that should be incorporated as the delta between the in-
dividual phases. The master charging station distributes the available volume of purchased electricity according to the connected vehi-
cles.
NOTE
The supply voltage (power source voltage) as well as
the connected phases (phase connected to the charge
point) and the rotation direction (phase rotation of the
charge point) must be configured correctly in order to
enable a distribution with phase accuracy.
Default Value: 20
Minimum Current Limit (A) – Minimum available charging current
This parameter is used to configure the lower limit of the load management. This parameter is used to provide a minimum charging cur-
rent for charging processes at the internal slave of the master charging station.
NOTE
Pause the charging process for vehicles with charging
currents < 6A.
Default Value: 6
Disconnected Limit (A) – Limit in case of a connection failure between the master and internal slave
In case of a connection failure between the master and internal slave, this parameter can be used to define a maximum upper limit that
the slave should use if necessary.
NOTE
Pause the charging process for vehicles with charging
currents < 6A.
Default Value: 6
DLM slave settings:
DLM Network id – ID of the charging cluster with which the slave charging station should be connected
Enter the ID of the charging cluster that the Webasto Live should connect to here. The Webasto Live then establishes a connection to
the corresponding master charging station. All currently connected slave charging stations as well as their assigned volume of pur-
chased electricity can be monitored in the dashboard of the master charging station.
DLM Master IP and port – IP address and port of the master charging station
If you have not connected the charging station to a master using the DLM ID, you can enter the IP address as well as the associated
port of the master charging station in here.
Example: 192.168.0.100:80
Minimum Current Limit (A) – Minimum available charging current
This parameter is used to configure the lower limit of the load management. This parameter is used to provide a minimum charging cur-
rent to the master charging station which is then used for charging processes at the internal slave.
NOTE
Pause the charging process for vehicles with charging
currents < 6A.
Disconnected Limit (A) – Limit in case of a connection failure between the master and external slave
In case of a connection failure between the master and external slave, this parameter can be used to define a maximum upper limit that
the slave should use if necessary.
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents