Prepare the Fabric Stack
At the top of the fabric stack, a stationary rail bracket will be installed into the stationary rail and the moving rail bracket will be
installed into the moving rail. In addition, a stationary rail bottom bracket will be installed into the bottom of the stationary rail.
Insert the stationary rail bracket into the vertical rail on the side where the fabric stacks.
■ ■
The bracket fits into the grooves on the rear of the vertical rail.
➤
■
Insert the bracket until it is seated and the bracket catch snaps into the hole on the back of the rail. Check that the bracket
➤
■
catch is fully engaged.
Moving Rail Bracket
Seated Bracket
Insert the moving rail bracket into the moving rail.
■ ■
Like the stationary rail bracket, the moving rail bracket fits into the grooves on the rear of the rail.
➤
■
Insert the bracket until the bracket catch snaps into the hole on the back of the rail. Check that the bracket catch is fully engaged.
➤
■
INSTALLATION
INSTALLATION
Left
Stack
Shown
Stationary
Rail
Bracket
Bracket Catch
6