Handling; Assembly Information; Mounting Conditions - Viega Eco Plus 8130.2 Instructions For Use Manual

Wc element
Table of Contents

Advertisement

3 Handling

3.1

Assembly information

3.1.1

Mounting conditions

Suitable walls
Construction height
Installation depth
WC ceramic
Actuation
Viega Eco Plus WC element
The Viega WC element is suitable for mounting on masonry wall con‐
structions and support profiles pursuant to the regulations in section
Ä „Regulations from section: Fields of application / Mounting condi‐
tions" on page 6.
The WC element may only be mounted on even wall surfaces.
With the construction height, the marked height of the upper edge of
the finished floor must be observed.
The installation depth can be between 85 mm and 200 mm.
The WC element can only be used in combination with wall-hung WCs
(fixing gauges for bore hole 180 mm or 230 mm).
The WC element can be extended by a remote actuation
Visign for Public1 (model 8326.21) or by an electronic actuation (model
8350.31 or 8350.32). The corresponding actuation method must be pre‐
pared before the WC element is clad and tiled.
The corresponding empty pipe (included in the scope of delivery of the
remote actuation) is required when preparing the remote actuation
Visign for Public1.
Handling
10 from 23

Advertisement

Table of Contents
loading

Table of Contents