Installation Procedure; Determining The Installation Position - Martin XHD QC 1 Installation Manual

Primary cleaner
Hide thumbs Also See for XHD QC 1:
Table of Contents

Advertisement

5.2
5.2.1
© Martin Engineering GmbH

Installation procedure

Determining the installation position

Determining the position of the mainframe and the tensioner of the
MARTIN
®
QC
#1 primary cleaner must be done on both sides of
the chute wall. In the process, those positions are determined where
the mainframe of the MARTIN
es through the chute wall or where the tensioner is installed on the
chute wall.
The MARTIN
®
XHD QC
a tensioner. This is disassembled at the factory before delivery and
is reassembled during the installation along with the primary clean-
er.
The installation of the MARTIN
the spring tensioner is described in this manual and the installation
manual of the tensioner.
There follows an overview of the installation steps:
No.
Installation step
1
Installing the scraper
2
Installing the tensioner
3
Tensioning the scraper
Tab. 1: Installation steps
There may be different local conditions that require different working
steps, which are shown below:
Installation on an encapsulated delivery system
• Carry out the instructions given in section 5.2.2 onwards.
Installation on an encapsulated delivery system with existing instal-
lation openings and brackets for belt cleaners.
• Carry out the instructions given in section 5.2.3 onwards.
Installation on an open delivery system
• Use the local resources to ensure that the dimensions for
the installation are correctly maintained.
1. Before starting with the work of installing the conveyor belt sys-
tem, switch off all accessories and secure them against being
switched on again inadvertently.
®
XHD QC
#1 primary cleaner pass-
#1 primary cleaner is operated along with
®
XHD QC
#1 primary cleaner and
13
Instruction
M3504
Tensioner
Tensioner
M3504UK-10/15